The Kings Process.

  • ARCHITECTURAL DESIGN

    STRUCTURAL ENGINEERING

    PERMIT APPLICTION

  • EXCAVATION

    BUILD FOOTINGS

    BUILD FOUNDATION

    POUR FOUNDATION

    DAMP PROOF & DRAIN TILE

    BACKFILL

  • FRAMING

    HVAC ROUGH-IN

    ELECTRICAL ROUGH-IN

    GAS ROUGH-IN

    ROUGH-IN TRADES INSPECTION

    FRAMING INSPECTION

    INSULATION

    DRYWALL

    FIXTURE SELECTIONS

  • PRIME WALLS & CEILINGS

    INTERIOR TRIM & DOORS

    SIDING

    PAINT

    FLOORING

    STONE WORK

    CABINETS

    DRIVEWAY INSTALLATION

    HVAC FINALIZATION

    PLUMBING FINALIZATION

    ELECTRICAL FINALIZATION